We've Got The County Covered
Sorted by date Results 1 - 1 of 1
A recent inspection found advanced spalling, cracking, and deterioration at the concrete beam ends in Span 1. Due to the severe conditions of the beam ends, the bridge can no longer carry traffic safely and reliably on the exterior beams. For public safety, traffic is restricted down to a single 12-foot lane centered on the bridge. Once the 12-foot centered lane is in place, any currently permitted overweight vehicles will be allowed to cross if the vehicle fits within the 12-foot restriction....